Best Time Grab Your Success In Oracle 1Z0-1003-22 Exam Test

Best Time Grab Your Success In Oracle 1Z0-1003-22 Exam Test
5 min read
04 September 2022

If you're trying to pass Oracle's 1Z0-1003-22 exam, then you've come to the right place. This exam is based on real-world case studies and includes real-world questions and answers. To prepare for the exam, you can practice with Oracle 1Z0-1003-22 questions and answers.

Best Time Grab Your Success In Oracle 1Z0-1003-22 Exam Test

Question: 1
 

Which two default attributes serve as stand-alone keys for work zones?

A. Service Code
B. Completion Code
C. Fault code
D. Zip code
E. Travel area
F. City

Answer: DE

Question: 2

A customer wants to configure the OFSC GUI to show when a resource has not activated their route by the exact planned shift start time and send an email to the resource's supervisor.
Which two options are true regarding how this requirement is supported?

A. Configuring a message scenario using the launch condition "Route is not activated" will also enable the Alert Setting "Route has not been started x minutes after the start time of resource work day".
B. The Alert Setting "Route has not been started x minutes after the start time of resource work day" should be configured for 1 minute(s).
C. The Alert Setting "Route has not been started x minutes after the start time of resource work day" should be configured for 0 minute(s).
D. The configuration related to email notification must be performed in the Message Scenarios.

Answer: AB

Question: 3

A utility company sees several "New Connect" acti iti  s being dropped into the routing bucket during the day.
They want "Meter Read" acti iti  s to be removed from the technician's route so that the "New Connect" acti iti  s can be assigned if the technician qualifies for the activity
 


They enabled reoptimization in their route plan and created a reoptimization filter targeting the "Meter Read" acti iti  s.

What additional settings are required in the route plan to meet the desired behavior?

A. Set the reoptimization goal to "Assign high priority activities". Then set cost of not assigning an activity for "Meter Read" on acti iti s in existing routes to "High", whereas cost of not assigning an activity for "New Connect" in acti iti  s in the routing bucket to "Low".
B. Set the reoptimization goal to "Reduce Overdue". Then set cost of not assigning an activity for "Meter Read" on acti iti s in existing routes to "High", whereas cost of not assigning an activity for "New Connect" in acti iti  s in the routing bucket to "Normal".
C. Set the reoptimization goal to "Assign high priority activities". Then set cost of not assigning an act or "Meter Read" on acti iti s in existing routes to "Low", whereas cost of not assigning an activity for "New Connect" in acti iti  s in the routing bucket to "High".
D. Set the reoptimization goal to "Assign high priority activities". Then set cost of not assigning an activity for "Meter Read" on acti iti  s in existing routes to "Highest", whereas cost of not assigning an
/ for "New Connect" in acti iti  s in the routing bucket to "Normal”.

Answer: D

Question: 4

A technician has been assigned a scheduled activity that he or she needs to perform later in the day.  Their company has a policy that their technicians perform some advance testing as an administrative task prior to the activity.
Which option would enable them to account for their time performing these tasks?

A. selecting "Prework" from within the activity In OFSC Mobility
B. adding a new "Prework" custom property to the "Edit/View activity" context in OFSC Mobility
C. creating a "start-after" link template between the preliminary work and the scheduled work
D. creating a "start-before" link template between the preliminary work and the scheduled work 
Answer: B

Question: 5

A customer has found that there are some instances where their technicians have recorded either exceptionally short (for example, "one-minute-wonders") or long (for example, they forgot to set the status to "complete") activity durations.
 


Given the importance of accurate data in a time-based self-learning system, which two constraints are in place and can be modified to ensure that outlier circumstances such as these do not affect future activity duration esti   ati  ns?

A. "Minimum relevant duration time in minutes" and "Maximum relevant duration time in minutes"
B. "Personalize the esti   ati  n of activity duration" and "Initial ratio of activity duration"
C. "Lower limit for personal ratio to calculate duration" and "Upper limit for personal ratio to calculate duration"
D. "Minimum relevant travel time in minutes" and "Maximum relevant travel time in minutes"

 
Answer: AB

Next Page 

In case you have found a mistake in the text, please send a message to the author by selecting the mistake and pressing Ctrl-Enter.
harry calm 2
Joined: 1 year ago
Comments (0)

    No comments yet

You must be logged in to comment.

Sign In / Sign Up